Ayers Elementary School, Fire Damage Renovation

Reconstruction of fire damaged administration offices and classroom spaces. Project included removal of  smoke and fire damaged materials and infrastructure, Abandonment of the existing layout and recreation of new spaces with higher vaulted ceiling ceilings, new exterior windows, roofing, electrical, data, speakers, clocks,  other areas damaged by the fire. The original school entrance was not easily identified, so a new entrance covered canopy was provided.
$800,000


James W. Dent Center

Renovation of district school administration building and adjacent support facilities, including removal of re-locatable buildings and replacement with new office buildings, re-roofing, ADA door and hardware upgrades, ADA toilet upgrades, path of travel upgrades, new painting, new low voltage data, and fire alarm systems, main electrical service upgrade and individual panel upgrades, new paving and striping, new ADA ramps and signage, building signage, installation of  sewage ejector system, modifications  and other modernization items defined by the project program.
$3.9 million


Oak Grove Middle School

Demolition and reconstruction of an existing middle school administration space. The existing 9,530 sf space accommodates administrative support services and student services with one single point of entry. The final program provided a layout that accommodated administrative support entry at the front of the school with side entry student services behind. The project involved new fire alarms, data, speakers, clocks, lighting, HVAC, casework, interior finishes, ADA signage, and toilet upgrades.
$800,000